BSP is the developer's headline per-sq.ft price. Total unit cost equals BSP × chargeable area, plus PLC, EDC, IDC, IFMS, club charges, parking, GST, and stamp duty on registration. When comparing projects, always reconstruct the all-in per-sq.ft cost from the full cost sheet — headline BSPs can be misleading by 10–25%.
PLC (Preferential Location Charge)
The premium added to a unit's base price for a preferred location — park-facing, corner, higher floor, pool-facing.
EDC (External Development Charges)
Statutory charges paid to the state (or HSVP in Haryana) for external infrastructure — roads, water, sewage, electricity.
IDC (Infrastructure Development Charges)
Statutory charges for state-level infrastructure — highways, master storm-water systems, regional connectivity.
